Tuesday, 22 November 2011

Foundation membrane



The foundation membrane has now been laid in prepartion for the cement

Monday, 14 November 2011

New super pitches 49 - 64

The pitches are taking shape and the gabion baskets have now arrived. These will be used to secure the top bank and will create a natural drainage.

New pitches 49 - 56



These pitches have now settled down and we have sown the grass seed

Pitches 57 - 64



The hard core on the new pitches is now bedding down and we will be able to sow the grass seed.

Thursday, 20 October 2011

Pitches between 49 and 64



The new pitches have now been dug out and the base has been laid. The back of the pitches will have chestnut fencing and at the side of the road will be gabian baskets to hold up the bank on the other side as there was a 4 ft difference in levels!!

pitches 49 - 64

The new road is taking shape

pitches 49 - 64



The right hand side of this area has now been levelled and the pitches will now be dug out