Foundation membrane
The foundation membrane has now been laid in prepartion for the cement
Monday, 14 November 2011
New super pitches 49 - 64
The pitches are taking shape and the gabion baskets have now arrived. These will be used to secure the top bank and will create a natural drainage.
New pitches 49 - 56
These pitches have now settled down and we have sown the grass seed
Pitches 57 - 64
The hard core on the new pitches is now bedding down and we will be able to sow the grass seed.
Thursday, 20 October 2011
Pitches between 49 and 64
The new pitches have now been dug out and the base has been laid. The back of the pitches will have chestnut fencing and at the side of the road will be gabian baskets to hold up the bank on the other side as there was a 4 ft difference in levels!!
pitches 49 - 64
The new road is taking shape
pitches 49 - 64
The right hand side of this area has now been levelled and the pitches will now be dug out
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
https://twitter.com/Appuldurcombe
Followers
Blog Archive
▼
2013
(1)
▼
March
(1)
Practical Caravan & Motorhome Magazine hold an an...
►
2012
(127)
►
October
(10)
►
July
(45)
►
May
(6)
►
April
(12)
►
March
(2)
►
February
(52)
►
2011
(153)
►
December
(20)
►
November
(27)
►
October
(55)
►
April
(7)
►
March
(34)
►
January
(10)
►
2010
(44)
►
November
(17)
►
May
(13)
►
April
(1)
►
March
(3)
►
February
(3)
►
January
(7)
About Me
Appuldurcombe Gardens
View my complete profile