Sunday, 14 November 2010

New pitches beginning to take shape


These are the new hardstanding serviced pitches in the Meadow Bluebell area, these have shared water points between two pitches

































installation of new electric and water points


Pitches are also being created on the opposite side of "Meadow Bluebell" area and this will be called "Meadow Crocus"

land draining in the meadow area


The area has been land drained to eliminate pooling on the ground in wet weather

Second layer of hardcore on the new road


The second layer of hardcore has been added








New pitches taking shape

The electric has been laid and the top soil levelled and grass seed has been sown, all we want now is some more sunshine to make the grass grow

Delivery of hardcore


lorry loads of hardcore are being delivered on a daily basis

Creation of new pitches


The weather has been good over the last few weeks and we are making considerable progress. We have landdrained the area and have laid the pipes for the water and electric points